无码无套少妇毛多18pxxxx,日韩欧美一区二区福利视频,17c视频在线观看,中文字幕久久久久久妻,日本黄色精品专区网站

Company NewsABOUT US
Construction requirements for exterior wall insulation technology
2021-08-12

The hollow drum, cracks and condensation of the external wall insulation wall are corrected, and the door and window openings are closed and improved. The iron railings, downspout brackets, aluminum alloy window frames, wires and various holes to be drilled in the wall on the balcony. The pipes are installed and completed, and the holes are repaired. After the exterior wall paint is completed, the glass installation should be carried out.


The surface of the base should be clean. The hollow drum, cracks and condensation of the external wall insulation wall are corrected, and the door and window openings are closed and improved. The iron railings, downspout brackets, aluminum alloy window frames, wires and various holes to be drilled in the wall on the balcony. The pipes are installed and completed, and the holes are repaired. After the exterior wall paint is completed, the glass installation should be carried out.


Before the exterior wall insulation construction, according to the design size of the exterior wall of the house and the technical requirements of the exterior insulation, the reference line should be hung and the control line should be punched. A vertical line is hung at the necessary parts of the outer corners and outer corners of the building, and a horizontal line is hung on the ground. The insulation board is a closed-cell ceramic material with high porosity, non-conductivity and strong heat storage capacity made by advanced production technology and high-temperature baking foaming process. Insulation material, durable, non-aging, exactly the same as the life of the building, is incomparable to traditional organic insulation materials.


This insulation board is suitable for building exterior wall insulation, fire isolation belt, building self-insulation cold, thermal bridge treatment, etc. The fire protection level is A1, which overcomes the fatal weakness of organic materials, which are afraid of open flames and flammable. Aging, filling the gap in domestic inorganic insulation materials. It is required to add the bottom alkali-resistant glass fiber mesh cloth to the wall part filled with fireproof insulation tape, and the vertical width of the mesh cloth shall not be less than 100mm on the outside of the insulation tape width.


The insulation mortar should be applied at least twice, the interval time should be more than 24 hours, and the thickness of each layer of plaster should not exceed 20 mm. Grid lines should be made according to the building facade and design requirements. After the insulation slurry is fully dried and solidified (pressed with the palm of your hand), it can be plastered on the fixed surface). Reasons for peeling off the surface of the insulation board: 1. The paint on the base is not dry. 2. The sealing primer is not in place. 3. The positive and negative corners of the corrugated line are not clear and the spraying is uneven.


赤壁市| 青岛市| 灵宝市| 尖扎县| 宜阳县| 鄂托克前旗| 松江区| 萨嘎县| 巢湖市| 喜德县| 青阳县| 聂拉木县| 防城港市| 民和| 肇庆市| 东台市| 黑河市| 海宁市| 民乐县| 南昌县| 美姑县| 黄浦区| 民和| 黄陵县| 奇台县| 北川| 山西省| 吉林省| 手游| 昭平县| 青州市| 隆子县| 治多县| 繁峙县| 永昌县| 理塘县| 柞水县| 峡江县| 桓台县| 平遥县| 普定县|