无码无套少妇毛多18pxxxx,日韩欧美一区二区福利视频,17c视频在线观看,中文字幕久久久久久妻,日本黄色精品专区网站

Company NewsABOUT US
External forces such as building gravity and wind force due to integrated exterior wall insulation
2022-04-23

The external wall insulation integration faces the gravity of the insulation board system itself and external forces such as wind. Reasonable process structure and supporting materials (such as various mortars and mesh) play a key role in solving the tensile resistance of the insulation board system. The greater the thermal resistance of the board, the more obvious the insulation performance of the board.


After the external wall insulation integration is completed, the operation should be carried out from bottom to top. And use a ruler to determine the overall flatness, and use a tool to press it and stick it to the wall using the point sticking method. Then wait for 24 hours before grinding, and the insulation layer should be inspected after completion.


And it adapts to the normal deformation of the base layer, does not produce cracks or hollows, can bear its own weight for a long time, does not produce harmful deformation, can withstand wind loads, withstand the long-term repeated effects of outdoor climate, does not cause damage, and will not fall off in rare earthquakes. When the mortar at the bottom of the finished board is dry, fill the joint with foam material, and then fill the entire joint with weather-resistant sealing silicone. Insulation materials can not only insulate the room, but also improve the indoor environment, reduce the probability of dampness and mold, and ensure a dry indoor environment.


The integrated design of exterior wall insulation should give priority to the integrated design of insulation and structure. When designing, the bonding area of the insulation layer and the base layer should be determined according to the unit area weight of the insulation material. Anchor bolt specifications and the number of anchor bolts per unit area. The construction is simple and fast, reducing costs and improving efficiency. Compared with traditional processes, the product is compounded at one time in the factory and directly bonded on site, which reduces the construction process and the impact of human factors on the quality of the project. Shorten the construction period, reduce costs and improve efficiency.


宁陕县| 怀远县| 龙口市| 安福县| 海口市| 塔城市| 赤城县| 克什克腾旗| 天峨县| 奉贤区| 台南县| 义马市| 新宾| 礼泉县| 乌鲁木齐市| 介休市| 乳山市| 沙湾县| 文水县| 疏附县| 罗定市| 台东县| 东莞市| 乌拉特前旗| 布尔津县| 孝昌县| 旅游| 高清| 隆回县| 黔江区| 固始县| 日喀则市| 鲁山县| 朝阳区| 怀柔区| 石城县| 桐梓县| 格尔木市| 丰原市| 东海县| 陈巴尔虎旗|