Construction steps for integrated thermal insulation and decoration
2023-02-24

The construction steps of thermal insulation and decoration integration. The construction steps should first be based on the construction drawings and on-site measurement and layout data, use software to draw the simulated building facade, draw the large sample drawing, and after confirmation by the design, supervision, and construction units, calculate the number of composite integrated panels, special mortars, and hardware accessories. When pasting the external wall thermal insulation and decoration integrated panels, it is mainly started from the bottom corners of the external wall, and the pasting is done in sequence. The adjacent panels should be ensured to be close to each other and aligned. The upper and lower panels must be arranged in staggered seams, and the panels at the corners should be staggered.


After the surface polymer mortar of the bottom layer of thermal insulation and decoration integration is applied, the mesh cloth is pressed in. When the mortar is dry and not sticky, the surface layer of special polymer mortar is applied. The plastering thickness is based on covering the mesh cloth, which is about 1mm, so that the total thickness of the surface mortar protective layer is controlled at about 3mm. Prepare according to the mixing ratio provided in the instruction manual of the special adhesive, with a dedicated person in charge, strict measurement, mechanical stirring, and ensure uniform mixing. The mixed adhesive can be used after being stirred for 5 minutes. The adhesive must be used as soon as it is mixed, and the mixed adhesive must be well bonded.


The exterior wall plastering, exterior wall surface flatness and verticality of the integrated thermal insulation and decoration have been accepted and qualified. The base wall surface should be solid and flat, and the flatness and verticality of the cement mortar leveling layer should meet the requirements of relevant standards. The base wall surface and its cement mortar leveling layer have been accepted and qualified in accordance with the specifications. If the height of the building is higher than 50 meters, the density of the fluorocarbon paint panel for integrated thermal insulation and decoration should be less than 10 kilograms per square meter. The bonding area between the decorative board and the base board shall not be less than 40%. If the bonding area of the building is greater than 50 meters, the bonding area between the boards shall not be less than 60%. This is in sharp contrast to the high-end coatings such as metal paint and fluorocarbon paint, which use more than ten processes to process the base in order to achieve the effect of imitating aluminum plates.


通山县| 开平市| 兰坪| 新闻| 岳阳市| 普定县| 崇信县| 武清区| 柳州市| 吴江市| 郁南县| 阿拉善右旗| 额尔古纳市| 禄劝| 微博| 宽城| 扎赉特旗| 广东省| 大石桥市| 云梦县| 武安市| 尚义县| 江华| 长葛市| 博野县| 仙桃市| 张掖市| 大港区| 慈利县| 定安县| 赞皇县| 怀化市| 莆田市| 荆门市| 积石山| 天峨县| 大冶市| 托克托县| 安图县| 公主岭市| 沾益县|