无码无套少妇毛多18pxxxx,日韩欧美一区二区福利视频,17c视频在线观看,中文字幕久久久久久妻,日本黄色精品专区网站

Industry TrendsABOUT US
Design scheme of exterior wall insulation materials
2023-03-27

Preparation of design scheme for exterior wall insulation materials: According to the structure and characteristics of the building, design the corresponding construction scheme and drawings of the ceramic board exterior wall insulation decoration integrated board. The bottom of the insulation exterior wall panel usually has a wooden trailer for shipping. This frame can only be removed when the panel is used. Self-insulating exterior wall panels should be stacked neatly before assembly and fixing, and should not be loaded and unloaded at will to avoid damage to the board.


The exterior walls of high-rise buildings generally require the installation of drainage pipes. The exterior wall rainwater pipe clamps, embedded iron parts, equipment through-wall pipes, etc. need to be installed in advance before installing the fireproof insulation board. During the construction process, the base layer is applied to the entire surface. Generally, a horizontal line will be drawn. The thickness needs to be controlled. After the coarse and fine control lines, the mortar used must be configured according to the five-to-one measurement. After five minutes of seamless mixing. It has a uniform closed-cell structure, low thermal conductivity, good thermal insulation performance, comparable to polyurethane, and better than polystyrene foam.


The design scheme of "gradual change layer by layer, flexible crack resistance, resistance as auxiliary, and important release" is adopted to prevent cracking of the exterior wall insulation system. The flexibility of the outer layer of each structural layer of the fireproof composite insulation board system should be higher than that of the inner layer, and gradually change layer by layer. After the completion and acceptance of the project construction, all underwater pipelines must be installed and accepted first. In addition, for walls or buildings with pipelines, anti-seepage treatment must be done in advance before installation and construction before the construction of the exterior wall composite insulation board can be carried out.


嘉峪关市| 洛浦县| 庄浪县| 来安县| 墨玉县| 平邑县| 鄯善县| 且末县| 开平市| 绵阳市| 绥棱县| 利津县| 固始县| 平和县| 宁蒗| 阳朔县| 习水县| 丰镇市| 九龙坡区| 綦江县| 巨野县| 吴桥县| 沈阳市| 满洲里市| 永新县| 邯郸县| 威信县| 延安市| 白水县| 伊吾县| 呼伦贝尔市| 襄樊市| 福清市| 武清区| 安阳县| 澄江县| 绥芬河市| 台山市| 东乡县| 金寨县| 闸北区|