The main components of integrated exterior wall insulation and decoration
2022-09-13

As the main component of the exterior wall system, the integrated exterior wall insulation and decoration adopts the combination of adhesive anchoring and construction installation to ensure the safety of the system. The overall light weight and high strength greatly reduce the building load, with good impact resistance, earthquake resistance and crack resistance, and solid and safe.


The integrated construction of exterior wall insulation and decoration requires the tensile bonding strength of the leveling waterproof layer and the base wall to be not less than 0.30Mpa, and the holes of the climbing frame, the holes of the tension bolts, and the holes of the scaffolding wall connection parts on the exterior wall should be filled and repaired. There was a problem with the insulation bonding process at the beginning, which led to the detachment of the bonding point and the wall in the later stage. The anchor point installation master also did something in this area. The two problem points converged at the same time, resulting in the bulging of the insulation wall.


The inner surface temperature of the integrated insulation layer of the exterior wall insulation and decoration is higher than zero degrees. Among them, insulation measures should be taken around the outer openings of the door and window frames, parapets, enclosed balconies, and overhanging components and other thermal bridges. A certain thickness should be reserved for the above parts. The exterior wall insulation decorative panels are adjusted and colored according to the different needs of customers. They have different textures and colors. The surface layer is colorful, with a realistic stone texture and various patterns.


The main component of the integrated exterior wall insulation decoration can be used for new construction or exterior wall reinforcement and insulation renovation of buildings, such as residential buildings, hospitals, schools, cold storage, farms, greenhouses, etc., which require wall insulation and reinforcement decoration. If the design requirements of the exterior wall insulation really need to be changed, the original design unit must issue the change procedures and the quality supervision agency must review and approve it before the construction can be organized according to the approved change design documents.