无码无套少妇毛多18pxxxx,日韩欧美一区二区福利视频,17c视频在线观看,中文字幕久久久久久妻,日本黄色精品专区网站

Industry TrendsABOUT US
How to speed up the construction of exterior wall insulation materials?
2023-02-21

The construction period of exterior wall insulation materials is short, generally no more than 3 months, while the service life of buildings is usually more than 50 years. Therefore, in terms of the importance of personnel and property safety and the long-term use of buildings, it is necessary to reduce the damage caused by fire during the use of buildings. The expansion coefficient of the thermosetting polystyrene board ethylene foam insulation board is the same as its special bonding mortar. It is less affected by thermal expansion and contraction, and has a low risk of falling off, which effectively solves the problem of falling off.


In order to speed up the construction, the exterior wall insulation material to be used is a 90mm thick rock wool board (dry density is 101kg/m3). Although the vertical shear requirements of the rock wool board can be met under the action of the anchor bolt alone, the rock wool board has a high density and heavy weight. In order to ensure the quality and safety of the external insulation system. The side of the polystyrene board should be coated with mesh cloth. No less than 200 pieces. The 80mm wide mesh cloth is firmly pasted on the base surface with glue mortar on the wide basis, and the polystyrene board is pasted on the remaining mesh cloth later.


When starting to bond the exterior wall insulation material, the technique to speed up the construction requires that the diameter of each coating point is >150mm, and there must be no less than 8 coating points per square meter. There is a 15mm gap between the boards to accommodate installation errors. When bonding the boards, the leveling should be tapped with a rubber hammer, and it cannot be adjusted by up and down, left and right shifting, etc., so as to avoid the adhesive overflowing into the gap between the boards due to the shifting of the extruded board, forming a cold bridge, which will have a greater negative impact on the insulation system.


亳州市| 达拉特旗| 简阳市| 法库县| 阳原县| 磐安县| 玉门市| 四川省| 神农架林区| 松江区| 台东市| 昂仁县| 察雅县| 彰化县| 定边县| 贵德县| SHOW| 盐池县| 虞城县| 兰溪市| 文安县| 普安县| 柘荣县| 弥渡县| 海伦市| 平阴县| 靖州| 林甸县| 通辽市| 尉氏县| 兴文县| 久治县| 赤城县| 大同市| 清水河县| 牡丹江市| 玛曲县| 阿克苏市| 永寿县| 平塘县| 遵化市|